Machine Load
How heavily loaded is this machine?
Compares the machine hours needed for demand with the hours available.
Open the calculatorRuns in your browser. No account needed.
How this tool works
Inputs, units and where to find them
| Input | Unit | Typical source |
|---|---|---|
| Demand / period | units | Units required in the period |
| Cycle time | min/unit | Cycle time per unit on this machine |
| Available machine hours | hr | Scheduled machine hours in the period |
| Efficiency | % | Demonstrated machine efficiency |
Method and formulas
- Required hours = demand × cycle ÷ 60 ÷ efficiency
- Utilisation = required ÷ available
Limitations
- Set-up time must be in cycle time or efficiency
- One part number at a time
Typical uses
- Monthly loading checks
- Deciding whether to move work between machines
Who it is for
- Planners
- Production managers
What you get
- AVAILABLE, TIGHT or OVERLOADED
- Required hours, utilisation and buffer
Interpreting the result
- Add the load of all parts sharing the machine