Prototype fidelity, the value of a test, sample sizes, Monte Carlo and queueing models, worked through one product from concept to release
Find design problems while they are cheap: cost of change, prototype fidelity, value of information, test sample sizes, Monte Carlo, queues, discrete-event simulation and reviews.
Start readingAbout this book
Every new product carries design problems that nobody has found yet. The plan cannot remove them; it can only decide where they will be found, and that decides what they cost. A problem found in a spreadsheet model costs an engineer’s afternoon. The same problem found in a production unit costs rework, retesting and lost weeks, and one found by customers after release costs field repairs and reputation. Planning by iterating means spending deliberately on cheap models, prototypes and tests early, so that the expensive surprises happen in the lab rather than on a customer’s site.
This book puts numbers on that spending. It starts with the cost of a problem by the stage at which it is found, then covers how to choose the fidelity of each prototype, how to value a test before paying for it, and how many rounds of iteration are worth running. It turns to test statistics: what a pass/fail test on a small sample shows, and how many units a measured comparison needs. It then builds three kinds of model that any engineering team can run: a Monte Carlo simulation of a product in use, a queueing model of a test lab, and a discrete-event simulation of a production test line. It ends with design reviews that examine evidence and the release decision that the evidence must support. Each chapter follows one running case, includes a plausible error and how it was found, and ends with an exercise and its worked answer.
It is for product, engineering and project managers, design and test engineers, and owners who plan development work. It assumes spreadsheet arithmetic and a little school statistics; probability, sampling and simulation are introduced where they are needed.
The running case
Every chapter follows one fictional development programme. This is an illustration. A Brisbane manufacturer of temporary power and lighting equipment for building sites, with about 45 staff, is developing the BPU-5, a wheeled battery power unit that replaces small petrol generators on residential building sites. It has a lithium iron phosphate battery of 5.12 kWh nominal, a 3.0 kW inverter supplying 230 V outlets, and a target mass of 82 kg, and it must run a typical site’s tools from 7:00 to 15:30 and recharge overnight.
The programme runs from concept approval to production release in 72 weeks, with a development budget of A$1.45 million, through a concept stage, an engineering validation build of 4 units, a design validation build of 12 units and a production pilot of 30 units, each followed by a formal review. The unit sells for A$6,900, and the business estimates that each week of later release costs about A$25,000 of contribution. The business’s records from its previous new product, a lighting tower, show where that product’s design problems were found and what each cost to fix.
The business, its products, its records, its people and every number in the case are invented. None describes KEVOS® work, a real business or a real product. All amounts are Australian dollars excluding GST.
How to use the book
Read Chapter 1 first, because the cost of a problem by stage and the cost of delay are used throughout. Chapters 2 to 4 cover what to build and when to stop iterating, Chapters 5 and 6 test sample sizes, Chapters 7 to 9 simulation and queueing models, and Chapter 10 reviews and release. Chapters 5 to 9 can be read in any order after Chapter 1. Every calculation was checked by running it, simulation results state their random seed and number of runs, and the KEVOS® tools linked in the chapters reproduce the sample-size arithmetic.
The book is one of a series of KEVOS® Library books on planning and delivering projects. The most relevant companions are Modular Projects by the Numbers, which applies models, pilots and acceptance tests to a rollout of identical units; Stage Gates and Stopping Rules by the Numbers, which treats the gate decisions that this book’s evidence feeds; First-of-a-Kind Technology by the Numbers, which deals with the extra risk of technology that has not been used at scale; and Reference Class Forecasting by the Numbers, which corrects cost and schedule estimates with the outcomes of similar past projects.
Source limits and professional responsibility
The methods are established and the sources are listed with what each was used for. Where the book quotes published results, they are attributed and their limits are stated; the cost-of-change ratios from software research, in particular, are not transferred to hardware. The running case’s costs, rates, test results and model inputs are teaching values, not market prices or measured data, and a real programme needs its own records, tests and analysis. Battery power equipment for building sites is subject to electrical safety, battery safety and transport requirements, work health and safety law, and the standards and regulators that apply in each state and territory; it must be designed, tested and certified by competent people. This book teaches how to plan development work and read its evidence. It is not an engineering design, a safety assessment, a compliance opinion or advice for any real product.
Who this book is for
Product, engineering and project managers, design and test engineers, and owners of Australian businesses who plan prototype builds, tests and simulations for a new product and must decide how much to spend finding out before committing.
What you will learn
- Put a cost on a design problem by the stage at which it is found, and plan where problems should be found.
- Choose the cheapest prototype that answers a question, and value a test or another iteration against its cost and delay.
- Size pass/fail and measured tests, and state what a small sample does and does not show.
- Build simple Monte Carlo, queueing and discrete-event models, check them, and read their results with their uncertainty.
- Run design reviews that test evidence, and set release criteria that the evidence must meet.
Inside this book
Chapters
- 01Finding problems while they are cheap: the cost of change by stageCost to fix a design issue from A$1,000 at concept to A$120,000 in the field, capture rates from the LT-4 record, and a plan that cuts BPU-5's expected fixing cost to A$637,625.
- 02Choosing prototype fidelity: the cheapest build that answers the questionAnalytical or physical, focused or comprehensive: BPU-5's five questions answered by a A$20,500 set of focused prototypes before a A$88,000 EVT build, and a thermal rig built without its lid.
- 03The value of a test: buying information before committingExpected value of perfect and sample information for a drop test before a A$65,000 rotomould tool: EVPI A$55,800, EVSI A$43,800, and why the test pays only if run in parallel.
- 04How many loops: diminishing returns and the speed of iterationLoop values of A$48,600 falling to A$2,446 on BPU-5's thermal subsystem, the stopping point for A$7,500, A$19,000 and A$57,500 loops, and a zero-find loop run at the wrong temperature.
- 05Pass-fail tests: what a small sample can and cannot showSuccess-run sample sizes (22 for R 0.90 at C 0.90), exact binomial bounds, why 3 of 3 passes shows only R above 0.368, and a A$18,100 specimen drop test in place of A$209,000 of units.
- 06Measured performance: sample sizes for means and comparisonsA 95% interval for the BPU-5's usable energy from 12 DVT units, sample sizes for a mean and for a supplier comparison, and a 3-pack test that nearly cost A$85,000 a year.
- 07Monte Carlo in a spreadsheet: will the unit last the dayA seeded 10,000-run model of site demand, capacity, cold and ageing finds an 8.22% chance of running out at 2 years, against a 55% margin from averages, and sizes the cell change.
- 08Queues in the test lab: utilisation, waiting and Little's lawOne climatic chamber at 79% utilisation: M/M/1 and Kingman waits, the utilisation curve, a peak checked by simulation, Little's law on the lab log, and a week lost to a queue.
- 09Discrete-event simulation: sizing the end-of-line testAn average-load sum said 2 test bays; a 12-week discrete-event model with day-shift loading shows 2 bays pass 5.4 units a day against 10 built, and 4 bays keep up.
- 10Design reviews and the release decisionFive BPU-5 reviews at A$3,640 each, 42 issues against the plan's 42.3, a fan swap approved without a re-test that cost A$85,000, release criteria for R1 to R3, and the outturn.
Apply This in Practice
Use these KEVOS® tools to try the method from this reading with your own numbers.
Explained in this book
Queue Wait Check (Utilisation, Chance of Waiting, Average Wait and Queue, Servers Needed)
Extends this chapter’s M/M/1 test-lab queue to several servers: utilisation, chance of waiting, average wait and the servers needed.
Used in Queues in the test lab: utilisation, waiting and Little's law
Applies this method
Process Change Trial (Sample Size, Welch t-Test, Improvement Decision)
Works out the sample size per group for the smallest worthwhile difference, and runs the Welch test on the results.
Used in Measured performance: sample sizes for means and comparisons
Applies this method
Sample Size to Estimate a Mean
Works out the sample size needed to estimate a mean for any precision and confidence.
Used in Measured performance: sample sizes for means and comparisons
References and source notes
The manuscript and worked examples are original KEVOS® writing. References inform particular concepts; their authors do not endorse this book. Web references were consulted on 28 October 2026.
- Bent Flyvbjerg and Dan Gardner. How Big Things Get Done (2023). Supplied source, in copyright. Used only as a subject map for the theme of planning by iterating with cheap models and tests. No passages, chapter structure, stories, heuristics or figures are reproduced, and the book's substance rests on the other sources listed.
- Stefan H. Thomke, Harvard Business School Press. Experimentation Matters: Unlocking the Potential of New Technologies for Innovation (2003). Background on experimentation as the core of development, on simulation and rapid prototyping changing its cost and speed, and on experimenting early and often. Used in Chapters 1, 2 and 4; no figures are quoted from it.
- Stefan H. Thomke, Management Science 44(6), 743–762. Managing experimentation in the design of new products (1998). Source for treating each experiment as a problem-solving cycle whose cost and duration depend on the fidelity of the model or prototype used. Background to the iteration model in Chapter 4.
- Karl T. Ulrich, Steven D. Eppinger and Maria C. Yang, McGraw-Hill Education. Product Design and Development, 7th edition (2020). Source for classifying prototypes as analytical or physical and as focused or comprehensive, and for matching each prototype to its purpose. Used in Chapter 2; the classification is described in the book's own words.
- Barry Boehm and Victor R. Basili, IEEE Computer 34(1), 135–137. Software defect reduction top 10 list (2001). Quoted in Chapter 1 for its software findings only: fixing a problem after delivery is often about 100 times as costly as during requirements and design, and for small, noncritical software systems the factor is more like 5:1. Neither ratio is applied to hardware; the running case uses its own records.
- Ronald A. Howard, IEEE Transactions on Systems Science and Cybernetics SSC-2(1), 22–26. Information value theory (1966). Origin of valuing information by what it changes in a decision under uncertainty. The basis of the expected value of perfect and sample information in Chapter 3.
- C. J. Clopper and E. S. Pearson, Biometrika 26(4), 404–413. The use of confidence or fiducial limits illustrated in the case of the binomial (1934). Source of the exact binomial confidence bounds used in Chapter 5 to state what a small pass/fail sample shows.
- James A. Hanley and Abby Lippman-Hand, Journal of the American Medical Association 249(13), 1743–1745. If nothing goes wrong, is everything all right? Interpreting zero numerators (1983). Source of the rule of three for zero failures in n trials, used as a cross-check in Chapter 5.
- National Institute of Standards and Technology. NIST/SEMATECH e-Handbook of Statistical Methods (NIST Handbook 151) (online, first issued 2002). Reference for sample sizes when testing a mean (section 7.2.2.2), for confidence intervals and comparisons of means, and for planning reliability test length (section 8.3.1.1). Used in Chapters 5 and 6; the case's calculations are the book's own.
- Nicholas Metropolis and S. Ulam, Journal of the American Statistical Association 44(247), 335–341. The Monte Carlo method (1949). The paper that named and described the Monte Carlo method. Cited in Chapter 7 for the method's origin.
- Averill M. Law, McGraw-Hill Education. Simulation Modeling and Analysis, 5th edition (2015). Main reference for building, verifying, validating and running simulation models, including input distributions, random numbers, replications and output analysis. Used in Chapters 7 and 9.
- John D. C. Little, Operations Research 9(3), 383–387. A proof for the queuing formula: L = λW (1961). Source of Little's law, that the average number of items in a stable system equals their arrival rate times their average time in the system. Used in Chapters 8 and 9.
- J. F. C. Kingman, Proceedings of the Cambridge Philosophical Society 57, 902–904. The single server queue in heavy traffic (1961). Origin of the heavy-traffic approximation for the mean wait in a single-server queue, used in Chapter 8 to show how waiting grows with utilisation and variability.
- Donald G. Reinertsen, Celeritas Publishing. The Principles of Product Development Flow (2009). Background on cost of delay, queues in product development and fast feedback, used in Chapters 3, 4 and 8.
- International Electrotechnical Commission. IEC 61160 Design review (2005 (edition 2.0)). Named by number and scope as the international standard giving guidance on planning and conducting design reviews. No clauses are quoted; the review practice in Chapter 10 is the book's own.
- International Electrotechnical Commission. IEC 62619 Safety requirements for secondary lithium cells and batteries, for use in industrial applications (2022 (edition 2.0)). Named by number and scope as an example of a battery safety standard a product like the running case's must be assessed against. No requirements are quoted.
- Standards Australia and Standards New Zealand. AS/NZS 3012 Electrical installations: Construction and demolition sites (2019). Named by number and scope as the standard for electrical installations and the in-service testing of electrical equipment on construction and demolition sites, the setting of the running case's product. No requirements are quoted.
- United Nations. UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, subsection 38.3 (current revised edition). Named as the set of tests lithium cells and batteries must pass before they are transported. No test parameters are quoted.