KEVOS® WORKOS · Operations

Shift Output

How much should one shift realistically produce?

Estimates practical output per shift from net time, stations, cycle time and efficiency.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Shift lengthhrShift length
Breaks + planned stopsminBreaks, meetings and planned stops in minutes
Cycle time / unitminCycle time per unit per station
Parallel stationsstationsParallel stations
Efficiency%Demonstrated efficiency over recent shifts

Method and formulas

  1. Net time = shift × 60 − breaks
  2. Theoretical output = net time × stations ÷ cycle
  3. Practical output = theoretical × efficiency

Limitations

  • Assumes one product per shift

Typical uses

  • Setting shift targets
  • Checking daily plans

Who it is for

  • Supervisors
  • Planners

What you get

  • Practical units per shift
  • Theoretical output and hourly rate

Interpreting the result

  • Calibrate efficiency against real shift output

WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Shift Output calculator