KEVOS® WORKOS · Operations
Capacity Check
How much can you realistically produce?
Calculates practical capacity from available hours, parallel stations, cycle time and efficiency, and compares it with demand.
Open the calculatorRuns in your browser. No account needed.
How this tool works
Inputs, units and where to find them
| Input | Unit | Typical source |
|---|---|---|
| Available hours / period | hr | Scheduled hours in the period at the constraint |
| Machines / parallel stations | stations | Parallel machines or stations doing the same work |
| Cycle time / unit | min | Measured cycle time per unit at the constraint |
| Realistic efficiency | % | Demonstrated efficiency (or OEE) at the constraint |
| Demand / period | units | Orders or forecast for the same period |
Method and formulas
- Capacity = hours × 60 × stations × efficiency ÷ cycle time (minutes)
- Utilisation = demand ÷ capacity
- Comfortable to 85%, tight to 100%
Limitations
- Single product and constant cycle time
- Changeovers must be inside efficiency or deducted from hours
Typical uses
- Checking whether a forecast can be made
- Deciding on overtime, extra shifts or outsourcing
Who it is for
- Production planners
- Operations managers
What you get
- AVAILABLE, TIGHT or SHORTFALL
- Practical capacity, utilisation and buffer
Interpreting the result
- Utilisation above 85% leaves little room for breakdowns and variation
References
- Hopp W. J. and Spearman M. L., Factory Physics (Waveland Press) on utilisation and variability