Bottleneck and Line Balance
Which step is constraining the process?
Identifies the constraint step in a three-step flow, compares it with takt time and shows line balance efficiency.
Open the calculatorRuns in your browser. No account needed.
How this tool works
Inputs, units and where to find them
| Input | Unit | Typical source |
|---|---|---|
| Available production time | min/day | Net available production minutes per day |
| Daily demand | units | Units required per day |
| Step A cycle time | min | Observed cycle time of step A (0 if not used) |
| Step B cycle time | min | Observed cycle time of step B (0 if not used) |
| Step C cycle time | min | Observed cycle time of step C (0 if not used) |
Method and formulas
- Takt = available minutes ÷ demand
- Constraint = step with the longest cycle time
- Line capacity = available minutes ÷ constraint cycle
- Balance efficiency = sum of cycles ÷ (steps × constraint cycle)
Limitations
- Three steps, one product, no buffers or downtime
- Uses average cycle times
Typical uses
- Finding where to improve first
- Balancing work between stations
Who it is for
- Production engineers
- Lean practitioners
- Supervisors
What you get
- The constraint step and whether it meets takt
- Line capacity and balance efficiency
- Step loading table
Interpreting the result
- Improving a non-constraint step does not raise output
- Low balance efficiency means idle time at faster steps
References
- Goldratt E. M. and Cox J., The Goal (North River Press)
- Rother M. and Shook J., Learning to See (Lean Enterprise Institute)
WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.