Project Health Check

How healthy is this project right now?

Combines schedule and cost variance with scope, risk and resource ratings into a project health score, and points to the weakest area.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Schedule variance%Schedule variance % from the baseline schedule or earned value (positive = behind)
Cost variance%Cost variance % against the approved budget (positive = over)
Scope stability1–5 scoreRating of scope stability from the change log (1 unstable, 5 stable)
Risk exposure1–5 scoreRating from the risk register (1 low, 5 very high)
Resource adequacy1–5 scoreRating of resource adequacy (1 inadequate, 5 adequate)

Method and formulas

  1. Schedule and cost signals = 100 − 2 × positive variance % (minimum 0)
  2. Score = 0.2 × schedule + 0.2 × cost + 20 × scope ÷ 5 + 20 × (6 − risk) ÷ 5 + 20 × resources ÷ 5
  3. Variance REVIEW above 10%, FAIL above 20%

Limitations

  • Favourable variances are not rewarded
  • Fixed weights
  • Ratings are subjective

Typical uses

  • Monthly project reporting
  • Portfolio reviews
  • Deciding where to focus a recovery

Who it is for

  • Project managers
  • Sponsors and PMOs

What you get

  • HEALTHY, AT RISK or CRITICAL
  • Health score and weakest area
  • Variance checks

Interpreting the result

  • Act on the weakest area first
  • Track the score over several periods; the trend matters more than one value

References

  • PMI, Practice Standard for Earned Value Management

WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.