KEVOS® MAKEOS · Money
Make or Buy (In-House Cost against a Supplier Price, Break-Even)
Is it cheaper to make this part in-house or buy it, at what quantity do the two cost the same, and how much does the right choice save at my volume?
Make-or-buy comparison: in-house unit cost from cycle time at your machine-hour rate plus material, with tooling and set-up as fixed cost; bought cost from the supplier price plus any one-off tooling or qualification charge; total cost at the planned quantity, the break-even quantity where the two totals meet (as the process break-even tool), and the cheaper option with its saving.
Open the calculatorRuns in your browser. No account needed.
How this tool works
Inputs, units and where to find them
| Input | Unit | Typical source |
|---|---|---|
| Planned quantity | units | Number of parts needed over the period compared. |
| Make | ||
| Tooling, fixtures and set-up (fixed) | $ | One-off cost to make in-house: tooling, fixtures, programming and set-ups. |
| Cycle time per part | min | Machine time per part including handling. |
| Machine-hour rate (machine and operator) | $/h | Hourly rate of the machine and operator (for example from the machine hour rate tool). |
| Material per part | $ | Material and bought-in items per part. |
| Buy | ||
| Supplier price per part | $ | Supplier’s price per part. |
| One-off supplier tooling or qualification | $ | One-off charge for buying: supplier tooling, first-article and qualification. |
| Freight and inspection per part | $ | Freight, receiving inspection and handling per bought part. |
Method and formulas
- Make: variable cost = cycle time ÷ 60 × rate + material; total = fixed + variable × quantity.
- Buy: variable cost = price + freight; total = one-off charge + variable × quantity.
- Break-even quantity = (fixed_make − fixed_buy) ÷ (variable_buy − variable_make) (as the process break-even tool).
- Example: making costs 10 a part plus 6000 fixed; buying 12.5; break-even at 1,800 parts; at 2000 make, saving 500.
Limitations
- Linear costs; capacity limits, overtime and learning effects change the picture.
- Strategic factors (know-how, supply risk, lead time) are not costed.
- Example values are illustrations. Replace them with values for your actual task.
Typical uses
- Decide whether to bring a bought part in-house
- Check a supplier quote against your own cost
- Find the volume at which making pays
Who it is for
- Manufacturing engineers
- Purchasing managers
- Business owners
What you get
- In-house and bought unit variable cost
- Totals at the planned quantity
- Break-even quantity and decision
Interpreting the result
- If the machine would otherwise stand idle, use its marginal rate, not the full machine-hour rate.
References
- Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 143–146, 1153–1160. Topic reference; no source tables or recommended settings are reproduced.