KEVOS® MAKEOS · Money

Learning-Curve Quote (Batch Hours, Cost and Price per Unit)

With the learning curve, how many hours will this batch take, what does each unit cost, and does the price I am offered give my margin?

Quote for a batch where labour time falls with repetition: time for the first and last unit, cumulative and average hours on the unit learning curve (as the learning curve tool), set-up, labour and machine cost at your hourly rate, material per unit, overhead, total and unit cost, the price per unit for your margin, and the margin the offered price gives.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Hours for the first unithHours the first unit takes (estimate or prototype record).
Learning rate%Learning rate: each doubling of quantity multiplies the unit time by this (80–90% typical for manual assembly).
Units in the batchUnits in the batch.
Set-up hourshSet-up hours for the batch.
Labour and machine rate$/hHourly rate for labour plus machine (for example from the machine hour rate tool).
Material per unit$Material and bought-in parts per unit.
Overhead on cost%Overhead added to the direct cost.
Margin wanted on price%Margin you want as a share of the selling price.
Price offered per unit$Price per unit the customer offers.

Method and formulas

  1. Unit time T_x = T₁ x^b with b = log₂(learning rate); cumulative hours = Σ T_x (as the learning curve tool).
  2. Cost = (cumulative + set-up) × rate + material × n, plus overhead.
  3. Price for margin m = unit cost ÷ (1 − m); margin offered = 1 − unit cost ÷ offer.
  4. Example: 50 units take 255.13 h; unit cost 676.63, price for 20% margin 845.79; the offer gives 24.819%.

Limitations

  • Unit learning curve (Crawford); the cumulative-average (Wright) model gives different numbers.
  • Learning stops at a floor set by machine time; check later units against standard times.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Quote a first production batch
  • Decide whether an offered price is acceptable
  • Show how cost falls with batch size

Who it is for

  • Estimators
  • Production managers
  • Business owners

What you get

  • Unit and cumulative hours
  • Cost in total and per unit
  • Price for the margin and the offered margin

Interpreting the result

  • The first units cost far more than the average: quote small first batches with care.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 146, 134–146. Topic reference; no source tables or recommended settings are reproduced.

WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.