KEVOS® WORKOS · Quoting

Labour Quote

What should the labour portion of the job cost?

Builds a labour sell value from hours, base rate, on-costs and target margin.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Estimated labourhrEstimated labour hours from a task breakdown or past jobs
Base hourly rate$/hrBase hourly wage
On-cost / overhead%On-cost loading from finance (superannuation, leave, payroll tax, insurance, overhead)
Target margin%Target gross margin

Method and formulas

  1. Loaded rate = base rate × (1 + on-cost %)
  2. Labour cost = hours × loaded rate
  3. Sell value = labour cost ÷ (1 − margin)

Limitations

  • Labour only; materials, travel and equipment are separate

Typical uses

  • Service and installation quotes
  • Setting hourly charge-out rates

Who it is for

  • Service managers
  • Estimators

What you get

  • Labour sell value and effective sell rate
  • Loaded rate and labour cost

Interpreting the result

  • Compare the effective sell rate with your published charge-out rate

WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Labour Quote calculator