KEVOS® MAKEOS · Mechanics

Crane Load Swing Check (Pendulum Period, Swing, Rope Tension)

If the trolley stops suddenly, how far will this hanging load swing, how long is each swing, and how much extra pull does the swing put on the rope?

Check of a load hanging from a crane trolley or hoist that stops abruptly from its travel speed: pendulum period for the rope length corrected for amplitude (as the pendulum period tool), the swing angle and horizontal swing from the kinetic energy of the load, the rope tension at the bottom of the swing including the centripetal force, the largest travel speed for your swing clearance, and checks against the clearance and the rated load.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Load masskgMass of the hanging load including the hook block below the sheave.
Rope length to the load centre of gravitymLength from the trolley sheave to the load’s centre of gravity.
Travel speedm/sTrolley or bridge travel speed when it stops.
Swing clearance availablemHorizontal distance the load may swing before it hits something.
Rated load of the crane and riggingkNRated load of the crane, hoist or rigging in force units.

Method and formulas

  1. Period T = 2π √(L ÷ g), corrected by (1 + θ² ÷ 16) for amplitude (as the pendulum period tool).
  2. Rise of the load h = v² ÷ 2g; swing angle θ = cos⁻¹(1 − h ÷ L); horizontal swing = L sin θ.
  3. Rope tension at the bottom = m g + m v² ÷ L; largest speed for clearance c = √[2g L (1 − cos(sin⁻¹(c ÷ L)))].
  4. Example: stopping from 0.5 m/s swings the load 0.39089 m (3.7354°) every 4.916 s; keep travel below 0.63978 m/s for 0.5 m clearance.

Limitations

  • Abrupt stop of the trolley; gradual braking reduces the swing.
  • Point load on a single fall; long loads also rotate.
  • Example values are illustrations. Replace them with values for your actual task.

Typical uses

  • Set a travel speed limit near obstructions
  • Explain load swing to crane operators
  • Check the dynamic rope load from swinging

Who it is for

  • Lifting supervisors
  • Crane engineers
  • Riggers

What you get

  • Period and swing angle
  • Horizontal swing and rope tension
  • Largest travel speed for the clearance

Interpreting the result

  • Swing grows with speed and with the square root of rope length: slow down and shorten the drop near obstructions.

References

  • Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 173–174. Topic reference; no source tables or recommended settings are reproduced.

WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.

Open the Crane Load Swing Check (Pendulum Period, Swing, Rope Tension) calculator