Architectural Sheet Metal by the Numbers
Chapter 1 of 8 · 10 min read
Profiles, girth and stretch-out
Describe a folded building profile by its points, calculate its girth and stretch-out, size the blank and the coil width, and measure the building so the profile actually fits.
Every piece of architectural sheet metal starts as a flat strip that is folded into a profile: a coping, a fascia, a barge capping, a flashing. The profile is the shape you would see if you cut through the finished piece at right angles to its length. Two numbers about it matter before anything else. The girth is the width of flat strip needed to fold it, and the stretch-out is the girth laid out as a straight line with each fold marked along it. Get the girth wrong and every length cut is scrap. Get the stretch-out right and it becomes the base line for every mitre and pattern in the chapters that follow.
This chapter describes W-40’s two main profiles, the canopy fascia and the parapet coping, by their points, calculates their girths and stretch-outs, sizes the blanks and the coil they are cut from, and deals with the gap between a drawing and the building it must fit. The failure case is a coping folded to the nominal width of the parapet, which did not fit the parapet as built.
Describe a profile by its points
A profile is easiest to handle as a list of points, each with two coordinates. This book uses d, the projection: the horizontal distance of the point out from the wall or board the profile is fixed to; and h, the height of the point above the profile’s lowest edge. Each fold is a point; each flat between folds is a straight segment joining two points.
W-40’s canopy fascia is a profiled cover over the canopy’s edge beam, with a top flange that sits on the beam, a vertical face, a 45° bevel and a lower face with a small bevelled drip. Its six points are listed in the table below, from A at the top back to F at the bottom.
Girth: the sum of the flats
Each segment’s length is found from the differences in d and h between its two points, by Pythagoras. A horizontal segment’s length is its change in d; a vertical one’s is its change in h; a sloping one needs both.
- AB, top flange
- 40 − 0 = 40.0 mm
- BC, upper face
- 250 − 210 = 40.0 mm
- CD, 45° bevel
- √(50² + 50²) ≈ 70.7 mm
- DE, main face
- 160 − 30 = 130.0 mm
- EF, drip bevel
- √(20² + 30²) ≈ 36.1 mm
- girth = 40.0 + 40.0 + 70.7 + 130.0 + 36.1 ≈ 316.8 mm
For thin sheet, 0.55 mm here, folded to tight inside radii, the difference between measuring along the outside, the inside or the middle of the metal is a fraction of a millimetre at each fold, and the sum of the flats measured to the profile line is close enough for cutting. For thicker material and larger radii, the bend allowance at each fold matters and is worked out from the material’s K-factor, as Sheet Metal Parts by the Numbers explains. Whichever method is used, it is used consistently, and checked with a test fold, as this chapter’s last sections describe.
The stretch-out
The stretch-out is the girth laid flat, with each fold’s position marked as a running distance from one edge. For the fascia, measured from A:
- A at 0;
- B at 40.0;
- C at 80.0;
- D at 150.7;
- E at 280.7;
- F at 316.8, the far edge.
These are the fold lines on the flat blank, and the folding sequence in the brake works from them. They are also the base line for mitres: in Chapter 2, each point’s position along the stretch-out becomes a station at which a cut ordinate is measured. Writing the stretch-out as a table of running distances, rather than as a drawing, makes it exact and easy to check.
The parapet coping
W-40’s parapet is 200 mm thick. Its coping covers the top with a flat that falls 10 mm across its width towards the roof side, so that rain on the coping runs into the box gutter rather than down the street facade. The coping has a 100 mm leg down the street face, a 75 mm leg down the roof face, and a 15 mm drip kicked out at the foot of each leg, so that water drips clear of the wall rather than running down it.
The top flat spans 240 mm horizontally, the parapet’s 200 mm plus 20 mm clearance each side for render variations and the legs’ fixing, and drops 10 mm across that span. Its length is √(240² + 10²) ≈ 240.2 mm. The coping’s girth is therefore about 100 + 240.2 + 75 + 15 + 15 ≈ 445.2 mm.
Size the blank and the coil
Profiles are cut from coil slit to a width, or from flat sheet. The girth, plus any trimming allowance, sets the blank width, and the coil width decides how many blanks come from each width and how much is wasted.
| Blanks across the width | Offcut per metre length | Waste | |
|---|---|---|---|
| 1,200 mm coil | 2 | about 310 mm | about 26% of the coil |
| 900 mm slit coil | 2 | about 10 mm, the trim | about 1% |
| 1,200 mm coil with a 300 mm flashing nested beside | 2 copings and 1 flashing | about 10 mm | about 1%, if the flashing is needed |
The fabricator ordered 900 mm slit coil for the copings, cutting two blanks across each width with a trim strip, and kept the 1,200 mm coil for the fascia, which, at 316.8 mm, fits three across with about 250 mm left for apron flashings.
Hems, drips and safe edges
Profiles are rarely just bare flats. A hem, the edge folded back on itself, stiffens a free edge, hides a cut edge and makes it safe to handle. A drip, a short outward kick, throws water clear of the surface below. A return, a short flange turned back towards the wall, lets a leg be clipped or fixed without fasteners through its face. Each adds to the girth, and each must be counted. A coping drawn without its drips, and cut to that girth, comes out 30 mm short and is useless.
They also affect the folding sequence. Hems are folded first, while the strip is flat; closed profiles are folded in an order that lets the brake’s blade clear the flanges already folded. A profile that looks right on paper but cannot be folded on the shop’s brake is redrawn before anything is cut. The fabricator checked each W-40 profile against the brake’s tooling and folding sequence at the drawing stage.
Measure the building, not just the drawing
Buildings are not built to the millimetre. A rendered parapet drawn at 200 mm may vary by 10 mm or more along its length, and may be out of straight and out of level. A coping that fits the drawing may not fit the wall.
The fabricator’s site measurer took the parapet’s actual width every 3 m along its length and at every corner, its line along the top with a string, and its level with a laser. The widths ranged from 198 mm to 214 mm. The coping’s 240 mm top, with 20 mm clearance either side of the nominal 200, could accommodate them, with the legs fixed over packers where the gap was large. Site measuring is work at height, done from the roof walkway or a platform behind the parapet, under the same fall-protection arrangements as the roofing work.
Test-fold the first piece
Before cutting a batch, the fabricator folded one short length of each profile and checked it against the drawing and against the building. Each flat was measured with a rule, each angle with a protractor, and the overall girth by unfolding a scrap offcut cut at the same time. The fascia’s test piece was held up to the canopy edge beam, and the coping’s to the parapet at its widest and narrowest measured points. Only then were the full lengths cut. A short test piece costs a few dollars; a batch cut to the wrong girth costs the coil.
Tolerances on a folded profile
A folded profile cannot be made exactly. The slitter cuts the coil within a tolerance on width, the brake positions each fold within a tolerance, and each fold springs back slightly from the angle the brake forms. On a profile with five folds, small errors accumulate along the stretch-out, so the last flat absorbs the sum of them. On the fascia, a 1 mm error at each of four fold positions could leave the drip bevel EF up to 4 mm longer or shorter than drawn.
The drawing should therefore say which dimensions matter. On the fascia, the faces seen from the street, BC and DE, and the projection to D and E, are critical; the hidden top flange AB and the drip EF can absorb small differences. The fabricator folds from the edge that matters most, measures the critical flats on the first piece, and lets the least visible flat take up the remainder.
Record the profile
Every profile the shop makes is recorded once, in a profile register, so that a repeat order or a matching repair years later uses the same numbers. Each W-40 entry holds the point list in d and h, the segment lengths and girth, the stretch-out table, the material and thickness, the coil width and blanks across it, the folding sequence on the shop’s brake, and the test-fold and site measurements it was checked against. An entry takes a quarter of an hour and saves redrawing the profile, and repeating its mistakes, every time it is needed again.
Allow for laps and joints along the length
Girth is the width of the blank; length is the other dimension. Profiles are cut in lengths that suit the coil, the brake and handling: W-40’s brake folds up to 4 m, and the copings are made in 3.2 m blanks so each finished length laps 100 mm over the next and still covers 3.1 m of parapet. Over the 40 m parapet, that means 13 lengths: twelve full lengths covering 37.2 m and a last one trimmed to cover the remaining 2.8 m, plus the corner pieces developed in the next chapters. Counting lengths and laps at the profile stage gives the take-off its quantities and tells the site crew how many joints to expect and where, so joints can be kept clear of downpipes, signs and other features on the facade.
A failure case: the coping that would not sit
This is an illustration. On an earlier job, the same fabricator received a drawing for a parapet coping with a 200 mm top flat for a 200 mm parapet, with legs fixed tight against each face. Nobody measured the building. The copings were cut and folded in a batch of thirty 3 m lengths.
On site, the first length would not sit down over the parapet. The render had been built out unevenly, and in places the parapet was 212 mm wide. Where it was narrower, the coping sat down but rocked. Every length was useless.
The detection came at the first dry fit on site, which at least happened before anything was fixed. The investigation found that the drawing had given the parapet’s nominal width and that no site measure had been taken. The correction was to measure the parapet every 3 m, redesign the coping with a wider top and clearance to suit the widest point, and re-cut the batch. The fabricator’s procedure now requires a site measure, and a test piece checked on site, before any coping or capping is cut in quantity.
How this applies to a small Australian business
Describe every profile by its points, calculate the girth from the segment lengths and include every hem, drip and return. Write the stretch-out as a table of running distances. Order coil widths that suit the girths you cut most, and nest small flashings in the offcuts. Check that each profile can be folded on your brake in a workable sequence. Measure the building, not the drawing, and test-fold the first piece and try it against the building before cutting the batch. These habits cost minutes and save coils.
Exercise: the barge capping
A simple barge capping for W-40’s canopy gables has a 120 mm leg down the gable face, a 150 mm top that falls 15 mm across its width, a 60 mm leg down the roof side and a 12 mm hem on each leg. What is its girth? From 1,200 mm coil, how many blanks fit across the width and what is the offcut?
Worked answer. The top flat is √(150² + 15²) ≈ 150.7 mm. The girth is 120 + 150.7 + 60 + 12 + 12 ≈ 354.7 mm. From 1,200 mm coil, three blanks fit across the width, using about 1,064.2 mm, leaving an offcut of about 135.8 mm, which is wide enough to fold small stopends or soakers rather than being scrapped.