Make or Buy (detailed cost comparison)

Should you manufacture this internally or buy it from a supplier?

A detailed annual make-or-buy comparison that separates material, labour, variable overhead, freight and fixed costs, with a cost build-up table.

Open the calculatorRuns in your browser. No account needed.

How this tool works

Inputs, units and where to find them

InputUnitTypical source
Annual quantityunitsAnnual demand forecast for the part
Make material / unit$/unitBill of materials cost per unit from the costing system
Make labour / unit$/unitStandard labour time × loaded labour rate
Make variable overhead / unit$/unitVariable overhead rate from finance (energy, consumables per unit)
Annual make fixed cost$Annual fixed costs that would stop if you bought (avoidable fixed cost)
Supplier price / unit$/unitSupplier quotation at the forecast volume
Freight / landed cost / unit$/unitFreight, duty, packaging and inspection per unit (landed cost)
Annual supplier/setup cost$Annual supplier set-up, tooling amortisation or account costs

Method and formulas

  1. Make variable = material + labour + variable overhead per unit
  2. Buy variable = supplier price + freight and landed cost per unit
  3. Annual cost = quantity × variable cost + annual fixed cost (each option)
  4. Crossover = (make fixed − supplier fixed) ÷ (buy variable − make variable)

Limitations

  • Assumes costs are linear with volume
  • Does not value strategic capability, IP or supply-chain risk
  • Excludes inventory carrying cost differences unless included in landed cost

Typical uses

  • Sourcing decisions for production parts
  • Preparing a make-or-buy case for management
  • Insourcing reviews when volumes grow

Who it is for

  • Manufacturing engineers
  • Cost accountants
  • Supply chain and procurement managers

What you get

  • MAKE or BUY with the annual difference
  • Cost per unit of each option
  • Annual cost build-up table
  • Crossover volume

Interpreting the result

  • Only avoidable fixed costs belong in the make option
  • If the decision flips within your forecast range, gather better data before committing
  • Check the sensitivity table for the input with the most leverage

References

  • Horngren, Datar and Rajan, Cost Accounting: A Managerial Emphasis (Pearson), relevant costing chapter

WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.