KEVOS® MAKEOS · Strength
Shrink or Press Fit Design from Required Torque
What interference does a hub need to transmit this torque and thrust, will the hub survive it, and how hot must it be to assemble?
Design of a cylindrical interference fit working backwards from the duty: the interface pressure needed for the torque and axial load with a safety factor, the diametral interference that produces it (Lamé thick-cylinder theory, solid or hollow shaft), hub bore stresses with a von Mises check, the press-in force, and the hub heating temperature for a shrink fit with assembly clearance.
Open the calculatorRuns in your browser. No account needed.
How this tool works
Inputs, units and where to find them
| Input | Unit | Typical source |
|---|---|---|
| Duty | ||
| Torque to transmit | N·m | Torque the fit must carry. |
| Axial load to transmit | kN | Axial force the fit must carry. |
| Safety factor on slip | Safety factor against slip. | |
| Geometry and materials | ||
| Interface diameter | mm | Nominal diameter at the interface. |
| Shaft bore (0 = solid) | mm | Bore of a hollow shaft. |
| Hub outside diameter | mm | Outside diameter of the hub. |
| Engaged length | mm | Length of the fit. |
| Friction coefficient at the interface | Coefficient of friction at the interface (about 0.1–0.2 for dry steel press fits; shrink fits often higher). | |
| Hub modulus | GPa | Elastic modulus of the hub. |
| Hub Poisson’s ratio | Poisson’s ratio of the hub. | |
| Shaft modulus | GPa | Elastic modulus of the shaft. |
| Shaft Poisson’s ratio | Poisson’s ratio of the shaft. | |
| Hub yield strength | MPa | Yield strength of the hub material. |
| Assembly | ||
| Hub expansion coefficient | µm/m·K | Linear expansion coefficient of the hub. |
| Assembly clearance wanted (diametral) | mm | Clearance needed to slide the hot hub on. |
| Shaft (ambient) temperature | °C | Starting temperature of the parts. |
Method and formulas
- Pressure for the duty: p = n √[(2T ÷ d)² + F_a²] ÷ (π d L μ).
- Interference δ = p d {[(D² + d²) ÷ (D² − d²) + ν_h] ÷ E_h + [(d² + d_i²) ÷ (d² − d_i²) − ν_s] ÷ E_s}.
- Hub bore hoop stress σ_t = p (D² + d²) ÷ (D² − d²); von Mises with the radial −p: √(σ_t² + σ_t p + p²).
- Press force = π d L μ p; hub temperature rise = (δ + clearance) ÷ (α d).
- Example: 500 N·m on a 50 mm fit 60 mm long needs 18.313 µm of interference.
Limitations
- Uniform pressure over the length; hub ends and keyways raise local stresses.
- Surface smoothing reduces effective interference; add roughness allowance.
- Example values are illustrations. Replace them with values for your actual task.
Typical uses
- Specify the interference for a gear, coupling or sleeve on a shaft
- Check that the hub can take the interference needed
- Set the induction or oven temperature for assembly
Who it is for
- Design engineers
- Mechanical engineers
- Engineering managers
What you get
- Required pressure and interference
- Hub stress check
- Press force and shrink-fit temperature
Interpreting the result
- Specify the minimum interference from this result and check the maximum interference against hub yield.
References
- Machinery’s Handbook, 29th edition (Industrial Press, 2012), printed pp. 631–633, 2442–2444. Topic reference; no source tables or recommended settings are reproduced.
WORKOS tools are screening and decision-support utilities. Verify important financial, engineering, safety, legal or operational decisions using appropriate professional standards and your organisation’s approved data.
Open the Shrink or Press Fit Design from Required Torque calculator