TemplatePublished 8 Jul 2026Updated 3 Aug 20263 min readBy Kevin Joginchecklistkick-offproject start-upgovernance
KEVOS® Templates & Examples · Checklists

Templates & Examples / Checklists

Project Kick-Off Checklist

A project earns most of its schedule in the first fortnight — or borrows against it. This checklist closes the twenty-four items that decide which.

  • Reading time · 3 min
  • 5 sections
  • 24 checkpoints · 5 domains
  • Print & tick
Day 1 Day 10 Mandate People Scope Controls Logistics delivery starts here Five domains close in a fortnight — every open box is borrowed schedule
Doc №TE-CHK-001
SectionTemplates & Examples → Checklists
Sheet1 of 1
DrawnKEVOS®
Date2026-07-08

§1Why the first fortnight decides the rest

Projects rarely fail at the end; they fail at the start and get discovered at the end.

Most of the classic late-project pathologies — scope arguments, missing authority, a schedule nobody baselined, a risk register invented for the first steering meeting — are not delivery problems. They are kick-off items that were never closed, quietly compounding while everyone was busy being busy. The cure is unglamorous: a written checklist, worked through in the first two weeks, with every box either ticked or consciously waived by the sponsor.

How to use this page. Print it, or copy the table into your project workspace. Work the 24 items in order within each domain. A box may be ticked, or waived in writing — the only forbidden state is silently open.

Contents

§2The checklist — 24 items in five domains

Mandate first: authority and money before people, people before scope, scope before controls, controls before logistics.

DomainCheckpointDone
MandateSigned business case or works order on file
Named sponsor with delegated authority confirmed
Success criteria written as measurable statements
Funding released for the first control period
Constraints and assumptions logged
PeopleCore team named, with availability confirmed in writing
RACI drafted for the first ten activities
Key stakeholders mapped and first contact made
Escalation path agreed with the sponsor
Kick-off meeting held and minuted
ScopeScope statement signed by the sponsor
Exclusions written down, not implied
WBS to at least level 2
Acceptance criteria agreed for the first deliverables
Change control route named in one sentence
ControlsBaseline schedule issued and stored
Cost codes open and mapped to the WBS
Risk register opened with the first ten risks scored
Reporting calendar issued to all parties
Document register and numbering scheme live
LogisticsSite or system access arranged for every team member
Inductions and permits booked
Collaboration space set up and shared
Standing meetings in every diary
Contents

§3The first-week cadence

The checklist tells you what; a simple cadence tells you when.

Days 1–5

Close the whole Mandate column and start People. Nothing else matters if the authority to proceed is soft. The kick-off meeting sits at the end of this week, not the start — a kick-off without a signed mandate is a rehearsal.

Days 6–10

Close Scope and Controls, book everything in Logistics. Issue the baseline schedule on day 10 even if it is coarse — a coarse baseline you can measure against beats a perfect one that arrives in month two.

Contents

§4Failure signatures — what a skipped box costs

Every open item has a signature you will meet later, wearing a different name.

Item skippedReappears in month three as…
Exclusions written down“We assumed that was included” — unpriced scope, delivered under protest.
Escalation path agreedDecisions ageing for weeks while everyone is technically waiting on someone.
Baseline schedule issuedProgress reports that compare this month with last month’s opinion.
Cost codes mapped to the WBSA forecast rebuilt from invoices, backwards, at reporting time.
Risk register openedThe first risk workshop held in response to the risk arriving.
Contents

§5Quick reference

The working core of the resource on one card rack.

Rule

Every box ticked, or waived in writing — never silently open.

Order

Mandate → People → Scope → Controls → Logistics.

Deadline

All 24 items closed by day 10; baseline out the same day.

Owner

The project manager runs the list; the sponsor signs the waivers.